A Wolfin single ply systems is being installed in the Leeds 16 area which includes a 20 year underwritten warranty by the manufacturer.

Pre-Winter Roof and Gutter Maintenance

by
Pre-Winter Roof and Gutter Maintenance

We emphasize the importance of having pre-winter checks to your roof and gutters.   This can prevent leaks etc. and save you added expense in the future when the weather has taken its toll.

Weather conditions cause work delays

by

Due to bad weather conditions this has delayed our projects but all working to schedule again.   Next week we are to commence a Stone Slate roof in the Dales.

18th Century Hall

by
18th Century Hall

Another section completed.   Re-slated in Burlingtons and replaced lead box gutter to lead code recommendations.

Congratulations to Laura

by
Congratulations to Laura

Congratulations and a very well done to Laura on her recent success.  As can been seen from the enclosed photograph she obtained numerous rosettes and sashes after a very successful day.

Laura_webhorse trials2edited

 

 

 

 

 

 

 

 

 

 

 

 

Craftsmen Schedule for the Week

by

Recovering of a roof with Wolfin RV Tectofin single ply membrane inclusive of all insulation, Tectofin edge detail and UPVC work.

Another project is re-roofing in second hand Welsh Slates, Velux roof lights, insulation, lead work to stack, alloy gutters, re-pointing and repainting.

Works that are due to commence are as follows:

Stone slate cottages to re-roof and insulate in the North Yorkshire Dales. 

18th Century Hall to re-slate with new lead lined box gutters, insulation and associated works in Burlingtons at Leeds 19 

A new slate project which is about to commence in the Centre of Wetherby.

There is also repair and maintenance work to numerous properties.

Please be aware that the bad weather has highlighted the need for good maintenance during the summer months prior to weather as numerous flat roof systems have failed and require replacement, ridges are also displaced, slates and tiles etc all which required attention before the Autumn and Winter months.

 

 

 

Re-roofing of Monastery

by
Re-roofing of Monastery

Re-roofing Phase 2 of Monastery in Wolfin RV single ply with new insulation.   The old bitumen based roof has been replaced.

There is a recently completed roof in Marley Moderns to the rear.

The Wolfin RV single ply membrane incorporates 2 polycarbonate dome roof lights.carmelite1

 

Roof Before Works

 

 

 

carmelite2

 

 

Roof During Works