Re-roof in Leeds 16

Re-roof in Leeds 16

by

During the process of re-roofing the front elevation.

Re-roof in Leeds 16

Re-roof in Leeds 16

by

Roof now loaded and slating ready to commence.

Re-roof in Leeds 16

Re-roof in Leeds 16

by

Scaffold erected in preparation for works to commence.

Re-roof Leeds 16

Re-roof Leeds 16

by

Supplied and fitted laths and permeable felt all ready for reslating.

Re-roof – Leeds 16

Re-roof – Leeds 16

by

Section of hip stripped to receive new insulation complying with current building code regulations.

Commencement of Re-roof in Leeds 16

Commencement of Re-roof in Leeds 16

by

Stripping off concrete tiles and supplying and fixing new slates and associated works.

Internal of Church

Internal of Church

by

All cleaned and decorated on completion

Works to Bellcote of Church

Works to Bellcote of Church

by

Re-slating and pointing to the Bellcote.

Bellcote to Church

Bellcote to Church

by

Repointed Bellcote in lime.

Works To Church

Works To Church

by

Carefully cutting out old mortar to the Bellcote and coping detail.