Re-roofing programme of works: Recovered the roof with reclaimed Welsh slate to match the existing. Re-bedded stone copings and pointed with lime mortar mix with a traditional finish. Replaced lead soakers and valleys to Lead Code regulations. Re-lined the ornamental stone gutters. Supplied and fixed high density insulation. Replaced the guttering to all elevations with new aluminium OG profile guttering system including rain water pipes.