Stripped and recovered Double Roman concrete interlocking tile project in Horsforth, Leeds 18 which involved installing maintenance free systems re: dry verge system shortly followed by dry ventilating ridge tile system. Replaced the flat roof dormer with a new flat roof covering. Installed insulation to Building Code regulations.