Presentation at Leeds College of Building

 Gary Shaw (Director) at Pickles Bros was asked to carry out a presentation/talk to students at Leeds College of Building yesterday; Wednesday 22nd May 2013.  He talked about the roofing industry, his experience and gave a question and answer session.
Work schedule commencing 13th May

Work schedule commencing 13th May

Stripped and recovered Double Roman concrete interlocking tile project in Horsforth, Leeds 18  which involved installing maintenance free systems re: dry verge system shortly followed by dry ventilating ridge tile system.  Replaced the flat roof dormer with a new flat...
Re-lining box gutter

Re-lining box gutter

Re-lined box gutter with a torch-on felt system in Boston Spa, Wetherby.  The new box gutter lining is guaranteed for a period of ten years.

Supplied and fixed maintenance free systems to a bungalow in Kirkstall, leeds re:  dry verge gable units and dry ventilating ridge tile system with site extruded aluminium OG profile guttering system (with a powder coat finish). Completed numerous repairs and...
Lead box gutter

Lead box gutter

Mr Steven Shaw – craftsman; supplied and fixed a code 6 lead box gutter which was welted and dressed using traditional skills all to Lead Code regulations.  On a college in Wakefield, Yorkshire. For more information on lead work please contact our office tel...

Schedule This Week

Another productive week – insight into what we have been achieving at Pickles Bros: Installed code 6 lead to box gutters incorporated with the  re-slating with second hand Burlington slate roof on a Grade II listed building in Wakefield. Recovering a...